Mr. Mayor, Madam City Administrator, and City Council Members,

An unusually strong, cold storm front from the Gulf of Alaska brought 0.90 inches of rain to Oakland, and occasional snow flurries below 1,000 ft. to other parts of the Bay Area, beginning Friday, March 10, through Monday, March 13. Storm-related activity was very light all weekend.

With the forecasters predicting snow as low at 500 ft. above sea level, PWA assigned 2-person overtime crews around the clock, prepared to handle snow and ice on the roadways. Crews patrolled the hill areas to ensure that the roads were safe and passable, and had sandbags and loose sand available to mitigate any snow or ice on roadways. Two crews were assigned to make sandbags throughout the weekend, making a total of 1,200 sandbags.

The Call Center remained closed throughout the weekend.

Amount of Rainfall (http://www.weather.gov/climate/index.php?wfo=mtr)

 

2006

24 Hours Ending 4:00 p.m. (Inches)

2006 Accumulated Precipitation

(Jul 1 –current date)

Percent of Normal

2005 Accumulated Precipitation

Seasonal Normal

(Jul 1 – Jun 30)

March 10

0.17

20.60

110

18.67

22.94

March 11

0.04

20.64

110

18.80

22.94

March 12

0.67

21.31

113

18.92

22.94

March 13

0.02

21.33

113

18.92

22.94

Location of Problem Areas

Number of Calls Received

  • 11 - Total calls received
  • 1 - Tree related call
  • 2 - Mudslide related calls
  • 8 - Sewer and storm drain related calls

Facility-related service requests:

  • Fire Station #6 - Roof leak over the kitchen - In process of repair
  • Downtown Senior Center - Roof leak - In process of repair
  • Dimond Library - Standing water on roof - Repaired
  • West Oakland Library - Roof leak over Circulation desk and Children’s Reading Room - Repaired
  • Stonehurst Park - Storm Drain leak - Referred to Drainage Div.
  • Mosswood Kitchen - Roof Leak - In process of repair
  • San Antonio Park - Broken storm drain - In process of repair
  • East Oakland Senior Center - Front entry - Repaired
  • Fire Station 20 - Hallway roof leak - In process of repair
  • Rotary Nature Center - Gutter leak - Repaired
  • Live Oak Pool Men’s Shower - Leak in wall - In process of repair
  • MSC Building 2 - Clogged gutter - Repaired

As always, crews are engaged in pre-storming activities as we continue to experience winter weather. I will keep you informed should any new development occur.